Friday 21st Oct 2016 - Logistics Manager

Two down, three to go

Construction is underway on five new industrial units at Valencia Park, part of the region’s prime distribution site Wakefield Europort, at the M62’s J31. With two of the speculative units already sold, the remaining three high specification buildings are receiving considerable interest.

The remaining units range in size from 1,395sq m to 2,195sq m. Each has its own parking and loading area, 7m eaves height, 10% fully fitted open plan offices and roller shutter loading doors. The distribution/ production units will be completed in July 2005 and are available on a freehold or leasehold basis.

The initial two units have been sold to Online Packaging, a supplier of industrial packaging materials, and Viscount Insulations, which installs cavity wall and loft insulations. Taking more than 1,395sq m, they will be on site in the early summer.