Browsing: Case Study

Britvic’s 275,000 sq ft national hub at Lutterworth was a showcase for automation technology when it opened but time has moved on and operator Wincanton has been working hard to ensure the systems are up to date.

Castle Metals Aerospace, which supplies high-performance metals to the aircraft, aerospace and defence industries, brought in a bespoke high level order picker to help improve put-away and picking at its 32,000 sq ft storage facility.

Kimberley-Clark rolled out an i2 transport management system across its European and North American transport operations in a move to cut costs and carbon dioxide emissions from its supply chain.

SSI Schaefer designed and built a steel support structure for a rack-clad building in Wisbech, Cambridgeshire for Dutch-based logistics service provider Partner Logistics.