Browsing: Case Study

Logistics systems integrator SDI Greenstone has supplied a high-capacity automated sortation system to book wholesaler Bertram Books.

Astec Conveyors has completed a project at the TNT Preston depot following the success of an earlier installation in Birmingham.

Ergo Floor Systems won a contract to supply and install its Traficline interlocking PVC floor tiles into four UK based NHS supply chain logistics centres.

Mezzanine specialist Hi-Store, has installed a lightweight mezzanine for a 24 hour Tesco Extra store at Newton Aycliffe, Durham.

Floor marking contractor ASG Services was chosen by sbh.uk to install 11,000m of line marking, 788 characters and digits, 112 floor embedded labels, and several hatched blocks at a distribution centre in Worksop, Nottinghamshire – its largest line marking

Hormann has installed 45 80mm thick DPU loading bay doors at the flagship Sainsbury’s warehouse in Northamptonshire.

British gas is seeing dramatic increases in throughput and capacity, as well as major manpower savings at its new £17 million distribution centre for gas and electrical appliance spare parts in Leicester.

Sales staff at SCC were sometimes hesitant to sell an item if the inventory listed only one or two items, as they didn’t want to let customers down if numbers proved to be slightly wrong. But a new system means that everyone is confident that if the syste